Specifications OWNERS Ivanhoe Cambridge I Inc. 300 - 95 Wellington Street West, Toronto, Ontario M5J 2R2 BUILDING MANAGER Ivanhoe Cambridge II Inc. 604 - 4720 Kingsway, Burnaby, B.C. V5H 4N2 ARCHITECT Stantec #1100 - 111 Dunsmuir Street Vancouver, BC V6B 6A3 STRUCTURAL CONSULTANTS Read Jones Christofferson Ltd. 3rd Floor, 1285 West Broadway Vancouver, B.C. V6H 3X8 MECHANICAL ENGINEERS Stantec #1100 - 111 Dunsmuir Street Vancouver, BC V6B 6A3 ELECTRICAL CONSULTANTS Schenke/Bawol Engineering Ltd. #200 - 1281 West Georgia Street Vancouver, B.C. V6E 3J7 GENERAL CONTRACTORS P.C.L Constructors Western Inc. 12391 Horseshoe Way Richmond, B.C. V7A 4X6 BUILDING MODULE Floor layout can accommodate 16 private corner offices to take full advantage of stunning panoramic views of mountains and ocean. HVAC Heating, ventilation and air conditioning is supplied to tenant premises by means of a ceiling ductwork system, through troffer light fixtures and perimeter diffusers. Return air for both interior and perimeter zones is taken through light fixture openings to the ceiling space, which acts as a return air plenum. The HVAC system is controlled via a Reliable Controls Automation System. The VAV system provides a constant temperature, and the Perimeter Fan Coil Units provide heating and cooling. The average interior control zone on the VAV system is 1400 square feet; the average Perimeter Fan Coil control zone is 200 square feet. Conditioned outside air is introduced at a rate of 20 CFM per occupant. After hours HVAC is available at an additional hourly rate. LIGHTING & CEILING SYSTEMS Lighting is provided by recessed 20" x 60", energy efficient, single tube T8 fluorescent fixtures with acrylic lenses. Open area lighting levels average 650 to 750 lux with a design criteria of 2.3 watts/sq.ft. at desk height. The light fixtures are portable plug-in fixtures, and fit in the 5' -0" ceiling module in any of six possible positions which provides complete flexibility in office space planning. Lighting is controlled via a low voltage relay system by Canadian General Electric (CGE), allowing local control as well as central control by computer. The ceiling system is exposed T-bar based on a 20" x 60" grid. The lay-in acoustical panels are mineral fibre, 20" x 60", with a factory applied white finish with high light reflectance. ELECTRICAL A grid of power outlets in the ceiling of each floor with empty conduit to a 120/208 Volt panel located on each floor. These panels obtain their power from the 347/600 Volt bus duct riser which serves no mechanical loads, reducing susceptibility to spikes and power dips. Space exists in each electrical room to add a second 120/208 Volt panel and transformer. The electrical design criteria for tenant use is 1.5 watts/sq.ft. for normal power, and 2 watts/sq.ft. for computer use assuming a terminal and screen every 300 sq.ft. and a printer every 600 sq.ft.; one electrical outlet per 1500 sq.ft. is provided. PLUMBING Standard tenant provisions include: - domestic cold water cap-offs at each floor - sanitary and vent cap-offs at each floor - an 8" diameter exhaust cap-off at each floor for small tenant washrooms - closed curcuit water system provided for localized tenant cooling requirements such as computer facilities. ELEVATORS Otis - overhead geared equipment 1000 ft./min. - 4 cabs servicing floors Lobby - 18. 3 cabs servicing floors 19 - 30. Freight Elevator combination passenger/service elevator servicing all floors. LOADING DOCK 3 loading docks, 1 equipped with manual leveller, and ample short-term parking for courier vehicles provided with direct access to the freight elevator at the base of the office tower. |